HESI A2
HESI A2 Math Practice Exam
1. An IV bag contains 500ml of saline solution and needs to be infused over 4 hours. What is the flow rate in drops per minute, assuming 20 drops per milliliter?
- A. 12.5 drops/min
- B. 25 drops/min
- C. 50 drops/min
- D. 100 drops/min
Correct answer: C
Rationale: To find the flow rate in drops per minute, first, calculate the total volume in drops by multiplying the volume in milliliters by the number of drops per milliliter (500ml * 20 drops/ml = 10,000 drops). Then, divide this total number of drops by the infusion time in minutes (4 hours * 60 minutes/hour = 240 minutes) to get the flow rate. Therefore, the correct flow rate is 50 drops/min. Choice A is incorrect because it miscalculates the flow rate. Choice B is incorrect as it also miscalculates the flow rate. Choice D is incorrect as it overestimates the flow rate.
2. A hospital nurse's schedule rotates every 4 days. The nurse works 3 days and has 1 day off. If the nurse's first day off is a Monday, what is the nurse's second day off?
- A. Friday
- B. Saturday
- C. Thursday
- D. Wednesday
Correct answer: A
Rationale: The nurse's schedule repeats every 4 days, with 3 days of work and 1 day off. If the first day off is Monday, then after 4 days (Monday + 4 days), the second day off will fall on Friday. Therefore, the correct answer is A. Choice B (Saturday), C (Thursday), and D (Wednesday) are incorrect as they do not align with the 4-day rotation pattern after the first day off on Monday.
3. A nurse works in the military hospital from 1300 to 2000. How many hours does this nurse work?
- A. 8 hours
- B. 11 hours
- C. 7 hours
- D. 12 hours
Correct answer: C
Rationale: The nurse works from 1300 to 2000, which is a 7-hour period. To calculate the hours worked, subtract the start time from the end time: 2000 - 1300 = 700, which is equal to 7 hours. Choice A, 8 hours, is incorrect as it does not reflect the actual duration. Choice B, 11 hours, is incorrect as it overestimates the hours worked. Choice D, 12 hours, is incorrect as it is also an overestimation of the hours worked.
4. A team from the highway department can replace 14 streetlights in 7 hours of work. If they work a 30-hour week at this job, in how many weeks will they replace all 120 downtown streetlights?
- A. 1½ weeks
- B. 2 weeks
- C. 2½ weeks
- D. 3 weeks
Correct answer: B
Rationale: If the team can replace 14 streetlights in 7 hours, it means they replace 2 streetlights per hour. In a 30-hour week, they can therefore replace 2 x 30 = 60 streetlights. To replace all 120 downtown streetlights, they will need 120 / 2 = 60 hours, which is equivalent to 60 / 30 = 2 weeks. Therefore, the correct answer is 2 weeks. Choice A, 1½ weeks, is incorrect because it doesn't consider the total number of streetlights that need to be replaced. Choice C, 2½ weeks, is incorrect as it overestimates the time needed. Choice D, 3 weeks, is incorrect as it underestimates the efficiency of the team in replacing streetlights.
5. If the outside temperature is currently 15 degrees on the Celsius scale, what is the approximate temperature on the Fahrenheit scale?
- A. 59°F
- B. 61°F
- C. 63.5°F
- D. 65.2°F
Correct answer: A
Rationale: To convert Celsius to Fahrenheit, you can use the formula: (°C × 9/5) + 32 = °F. Substituting 15°C into the formula gives us (15 × 9/5) + 32 = 59°F. Therefore, the approximate temperature on the Fahrenheit scale for 15 degrees Celsius is 59 degrees Fahrenheit. Choice B, C, and D are incorrect as they do not align with the correct conversion formula and calculation.
Similar Questions
Access More Features
HESI A2 Basic
$89/ 30 days
- 3,000 Questions with answers
- 30 days access
HESI A2 Premium
$129.99/ 90 days
- Actual HESI A2 Questions
- 3,000 questions with answers
- 90 days access