HESI A2
HESI A2 Math Practice Test 2023
1. If a man reads 2 chapters a day and there are 6 pages per chapter in a 798-page book, how long will it take him to finish the book?
- A. 133 days
- B. 399 days
- C. 75 days
- D. 66.5 days
Correct answer: D
Rationale: To find the total number of chapters, divide the total number of pages by the number of pages per chapter: 798 ÷ 6 = 133 chapters. If he reads 2 chapters a day, it will take him 133 ÷ 2 = 66.5 days to finish the book. Therefore, the correct answer is 66.5 days. Choice A is incorrect because it miscalculates the number of days required. Choices B and C are incorrect as they do not consider the correct calculation based on the given information.
2. How many millimeters are in 4 meters?
- A. 400 mm
- B. 4000 mm
- C. 40 mm
- D. 100 mm
Correct answer: B
Rationale: To convert meters to millimeters, you need to know that there are 1000 millimeters in 1 meter. Therefore, to find out how many millimeters are in 4 meters, you multiply 4 (meters) by 1000 (millimeters per meter), which equals 4000 millimeters. Choice A, 400 mm, is incorrect because it represents 4 decimeters, not 4 meters. Choice C, 40 mm, is incorrect because it represents 4 centimeters, not 4 meters. Choice D, 100 mm, is incorrect because it represents 1 meter, not 4 meters.
3. How many liters are in 2,000 milliliters?
- A. 4 liters
- B. 1 liter
- C. 2 liters
- D. 4 liters
Correct answer: C
Rationale: The correct answer is 2 liters. There are 1,000 milliliters in a liter. Therefore, 2,000 milliliters is equal to 2 liters. Choice A is incorrect because it incorrectly doubles the conversion. Choice B is incorrect as it represents the amount in milliliters, not liters. Choice D is a duplicate of choice A, which is incorrect.
4. A hospital day staff consists of 25 registered nurses, 75 unlicensed assistants, five phlebotomists, six receptionists and office staff, and 45 physicians. One summer day the staff was at only 68% strength. How many people were working that day?
- A. 106 people
- B. 100 people
- C. 110 people
- D. 120 people
Correct answer: A
Rationale: To find the total number of staff members, sum up the different roles: 25 (nurses) + 75 (assistants) + 5 (phlebotomists) + 6 (office staff) + 45 (physicians) = 156 total staff. Then, calculate 68% of the total staff: 156 × 0.68 = 106.08, which is approximately 106 people. Therefore, 106 people were working that day. Choice A is correct. Choices B, C, and D are incorrect as they do not reflect the accurate calculation based on the given information.
5. A lab needs 200ml of a 5% salt solution. They only have a 10% solution. How much 10% solution and water should be mixed?
- A. 100ml 10% solution, 100ml water
- B. 150ml 10% solution, 50ml water
- C. 160ml 10% solution, 40ml water
- D. 200ml 10% solution, 0ml water
Correct answer: B
Rationale: Rationale: 1. Let x be the volume of the 10% solution needed and y be the volume of water needed. 2. The total volume of the final solution is 200ml, so x + y = 200. 3. The concentration of the final solution is 5%, so the amount of salt in the final solution is 0.05 * 200 = 10g. 4. The amount of salt in the 10% solution is 0.1x, and the amount of salt in the water is 0, so the total amount of salt in the final solution is 0.1x. 5. Since the total amount of salt in the final solution is 10g, we have 0.1x = 10. 6. Solving for x, we get x = 100ml. 7. Substituting x =
Similar Questions
Access More Features
HESI A2 Basic
$89/ 30 days
- 3,000 Questions with answers
- 30 days access
HESI A2 Premium
$129.99/ 90 days
- Actual HESI A2 Questions
- 3,000 questions with answers
- 90 days access