HESI A2
HESI A2 Math Practice Test 2023
1. How many ounces are in 4 quarts?
- A. 64 ounces
- B. 128 ounces
- C. 32 ounces
- D. 16 ounces
Correct answer: B
Rationale: The correct answer is B: 128 ounces. There are 32 ounces in a quart, so when you have 4 quarts, you multiply 4 by 32 to get the total number of ounces, which equals 128. Choices A, C, and D are incorrect because they do not reflect the correct conversion from quarts to ounces.
2. What is 2/3 of 60 + 1/5 of 75?
- A. 45
- B. 55
- C. 15
- D. 50
Correct answer: B
Rationale: To solve the expression, first calculate 2/3 of 60 by multiplying 60 by 2/3, which equals 40. Then, calculate 1/5 of 75 by multiplying 75 by 1/5, which equals 15. Finally, add these results together: 40 + 15 = 55. Therefore, the correct answer is 55. Choice A (45) is incorrect because it seems to be the sum of the two fractions, not their individual calculations. Choice C (15) is incorrect because it only represents 1/5 of 75. Choice D (50) is incorrect as it might be a miscalculation of the sum of the two fractions.
3. A farmer's production statistics find that it takes 2 chickens to produce 6 eggs in 24 hours. How many chickens will be needed to produce 24 eggs in 24 hours?
- A. 12 chickens
- B. 4 chickens
- C. 3 chickens
- D. 8 chickens
Correct answer: D
Rationale: First, find how many eggs 1 chicken can produce in 24 hours. If 2 chickens produce 6 eggs: 6 eggs / 2 chickens = 3 eggs per chicken. To produce 24 eggs, we divide the required number of eggs by the production rate per chicken: 24 eggs / 3 eggs per chicken = 8 chickens. Therefore, the correct answer is D. 8 chickens. Choice A, 12 chickens, is incorrect because it does not consider the production rate per chicken. Choice B, 4 chickens, is incorrect as it does not account for the number of eggs needed. Choice C, 3 chickens, is incorrect because it miscalculates the production rate per chicken.
4. If two workers can finish building a play set in 18 hours, how long will it take 4 workers to build 3 play sets?
- A. 27 hours
- B. 36 hours
- C. 24 hours
- D. 54 hours
Correct answer: A
Rationale: If 2 workers can complete building one play set in 18 hours, it means one worker would take 36 hours to complete the same task. When the number of workers is doubled to 4, the time is halved, so 4 workers would take 18 hours to build one play set. To build 3 play sets, the total time needed would be 3 times the time for one play set, which equals 54 hours. Therefore, 4 workers can build 3 play sets in 27 hours, making choice A the correct answer. Choices B, C, and D are incorrect because they do not account for the correct relationship between the number of workers and the time required to complete the task.
5. Change 1/6 to a percent.
- A. 16.67%
- B. 15%
- C. 14%
- D. 17%
Correct answer: A
Rationale: To convert 1/6 to a percentage, you multiply 1/6 by 100. This gives you 16.67%. Choice A is correct. Choice B, 15%, is incorrect as it is the rounded value of 1/6 as a percentage. Choice C, 14%, and Choice D, 17%, are also incorrect as they do not represent the accurate conversion of 1/6 to a percentage.
Similar Questions
Access More Features
HESI A2 Basic
$89/ 30 days
- 3,000 Questions with answers
- 30 days access
HESI A2 Premium
$129.99/ 90 days
- Actual HESI A2 Questions
- 3,000 questions with answers
- 90 days access