HESI A2
HESI A2 Math Practice Exam
1. After taking several practice tests, Brian improved the results of his GRE test by 30%. Given that the first time he took the test Brian answered 150 questions correctly, how many questions did he answer correctly on the second test?
- A. 105
- B. 120
- C. 180
- D. 195
Correct answer: D
Rationale: If Brian answered 150 questions correctly on the first test, after improving his results by 30%, he would have answered (150 * 1.30) = 195 questions correctly on the second test. Therefore, the correct answer is 195, option D. Choices A, B, and C are incorrect as they do not account for the 30% improvement in the number of questions Brian answered correctly on the second test.
2. Solve for x: 4x - 8 = 16.
- A. x = 7
- B. x = 7
- C. x = 4
- D. x = 6
Correct answer: D
Rationale: To solve the equation 4x - 8 = 16, first, add 8 to both sides to isolate 4x: 4x = 24. Then, divide by 4 to solve for x: x = 6. Therefore, the correct answer is D. Choice A, x = 7, is incorrect as the correct solution is x = 6. Choices B and C are duplicates of choice A and are also incorrect.
3. If Kevin can wash 30 cars in 15 minutes, how many minutes will it take him to wash 100 cars?
- A. 50 minutes
- B. 55 minutes
- C. 30 minutes
- D. 45 minutes
Correct answer: A
Rationale: To find out how many minutes Kevin will take to wash 100 cars, set up a proportion: 30 cars is to 15 minutes as 100 cars is to x minutes. Cross multiplying gives 30x = 1500. Solving for x, x = 1500 / 30 = 50. Therefore, it will take Kevin 50 minutes to wash 100 cars. Choice A is correct. Choice B, C, and D are incorrect as they do not correctly calculate the time needed based on the given information.
4. Alan is making a table. The table will be 6 1/2 feet long and 4 feet wide. The board for the table is 7 7/8 feet long and 4 feet wide. How much of the board will Alan need to cut off?
- A. 1 3/8
- B. 2
- C. 7/8
- D. 3/4
Correct answer: A
Rationale: To determine how much board Alan needs to cut off, subtract the length of the table from the length of the board: 7 7/8 - 6 1/2 = 1 3/8. Therefore, Alan needs to cut off 1 3/8 feet from the board. Choice A is correct. Choice B (2) is incorrect because the subtraction result is 1 3/8, not 2. Choice C (7/8) is incorrect as it represents only the fraction part of the answer, not the whole amount. Choice D (3/4) is incorrect as it is a different fraction value than the result of the subtraction.
5. A team from the highway department can replace 14 streetlights in 7 hours of work. If they work a 30-hour week at this job, in how many weeks will they replace all 120 downtown streetlights?
- A. 1½ weeks
- B. 2 weeks
- C. 2½ weeks
- D. 3 weeks
Correct answer: B
Rationale: If the team can replace 14 streetlights in 7 hours, it means they replace 2 streetlights per hour. In a 30-hour week, they can therefore replace 2 x 30 = 60 streetlights. To replace all 120 downtown streetlights, they will need 120 / 2 = 60 hours, which is equivalent to 60 / 30 = 2 weeks. Therefore, the correct answer is 2 weeks. Choice A, 1½ weeks, is incorrect because it doesn't consider the total number of streetlights that need to be replaced. Choice C, 2½ weeks, is incorrect as it overestimates the time needed. Choice D, 3 weeks, is incorrect as it underestimates the efficiency of the team in replacing streetlights.
Similar Questions
Access More Features
HESI A2 Basic
$49/ 30 days
- 3,000 Questions with answers
- 30 days access
HESI A2 Premium
$99/ 90 days
- Actual HESI A2 Questions
- 3,000 questions with answers
- 90 days access