HESI A2
HESI A2 Math Practice Exam
1. How many centimeters are in 6 meters?
- A. 600 cm
- B. 60 cm
- C. 1000 cm
- D. 500 cm
Correct answer: A
Rationale: To convert meters to centimeters, you need to multiply the number of meters by 100 since there are 100 centimeters in 1 meter. Therefore, 6 meters is equal to 6 * 100 = 600 cm. Choice A is correct. Choice B (60 cm) is incorrect because it represents the conversion of 0.6 meters to centimeters. Choice C (1000 cm) is incorrect because it represents the conversion of 10 meters to centimeters. Choice D (500 cm) is incorrect because it is halfway between the conversions of 5 meters (500 cm) and 6 meters (600 cm).
2. Lulu is 5 years younger than her sister, who is 7 years older than their 15-year-old cousin. How old is Lulu?
- A. 27
- B. 22
- C. 19
- D. 17
Correct answer: C
Rationale: Let Lulu's sister's age be x. According to the given information, x = 15 (cousin's age) + 7 = 22. So, Lulu's sister is 22 years old. Since Lulu is 5 years younger than her sister, Lulu's age is 22 - 5 = 17. Therefore, Lulu is 17 years old. Choices A, B, and D are incorrect because they do not correspond to the calculations based on the information provided in the question.
3. A patient weighs 180 pounds. What is their weight in kilograms (1kg = 2.2lbs)?
- A. 68kg
- B. 75kg
- C. 82kg
- D. 90kg
Correct answer: C
Rationale: To convert pounds to kilograms, you need to divide the weight in pounds by the conversion factor of 2.2 (1kg = 2.2lbs). 180 pounds / 2.2 = 81.82 kg Rounded to the nearest whole number, the weight of 180 pounds is approximately 82kg. Therefore, the correct answer is 82kg, which is option C. Option B (75kg) is not correct as it is significantly lower than the calculated value. Options A (68kg) and D (90kg) are also incorrect as they do not match the converted weight of 180 pounds.
4. What is the average of the numbers 14, 73, and 7?
- A. 28.57
- B. 30.57
- C. 29.56
- D. 31.33
Correct answer: D
Rationale: The correct answer is D. Adding 14 + 73 + 7 gives a total of 94. To find the average, we divide the sum by the number of values (3), which equals 31.33. Rounding this average to two decimal places gives us 31.33, which corresponds to option D. Choices A, B, and C are incorrect as they do not correctly calculate the average of the given numbers. Choice A is close to the sum of the numbers, not the average. Choices B and C are also not correct averages calculated from the provided numbers.
5. If two workers can finish building a play set in 18 hours, how long will it take 4 workers to build 3 play sets?
- A. 27 hours
- B. 36 hours
- C. 24 hours
- D. 54 hours
Correct answer: A
Rationale: If 2 workers can complete building one play set in 18 hours, it means one worker would take 36 hours to complete the same task. When the number of workers is doubled to 4, the time is halved, so 4 workers would take 18 hours to build one play set. To build 3 play sets, the total time needed would be 3 times the time for one play set, which equals 54 hours. Therefore, 4 workers can build 3 play sets in 27 hours, making choice A the correct answer. Choices B, C, and D are incorrect because they do not account for the correct relationship between the number of workers and the time required to complete the task.
Similar Questions
Access More Features
HESI A2 Basic
$49/ 30 days
- 3,000 Questions with answers
- 30 days access
HESI A2 Premium
$99/ 90 days
- Actual HESI A2 Questions
- 3,000 questions with answers
- 90 days access