HESI A2
HESI A2 Math 2024
1. Convert this military time to regular time: 0705 hours.
- A. 7:05 A.M.
- B. 7:05 P.M.
- C. 5:07 A.M.
- D. 5:07 P.M.
Correct answer: A
Rationale: In military time, 0705 hours translates to 7:05 A.M. Military time follows a 24-hour clock format, so there is no change from A.M. to P.M. like in regular time. Choice B (7:05 P.M.) is incorrect as 0705 hours is in the morning. Choices C (5:07 A.M.) and D (5:07 P.M.) are incorrect due to the incorrect order of hours and minutes.
2. Last night at the hospital, 76 babies were born. Of the births, 45% were girls. How many boys were born last night? (Round your numbers to the nearest whole number).
- A. 42
- B. 34
- C. 35
- D. 36
Correct answer: A
Rationale: When 45% of the babies were girls, it means the remaining 55% were boys. To determine the number of boys, calculate 55% of 76, which equals approximately 41.8, rounding up to 42. Therefore, 42 boys were born last night at the hospital. Choice B, C, and D are incorrect as they do not reflect the accurate calculation of the number of boys born.
3. How many milliliters are in 4 liters?
- A. 40 milliliters
- B. 40 milliliters
- C. 4000 milliliters
- D. 4 milliliters
Correct answer: C
Rationale: To convert liters to milliliters, you must remember that 1 liter is equal to 1,000 milliliters. Therefore, to find out how many milliliters are in 4 liters, you multiply 4 by 1,000. This gives you a total of 4,000 milliliters in 4 liters. Choices A, B, and D are incorrect because they do not correctly convert liters to milliliters. A and B incorrectly represent 40 milliliters, which would be the result if you mistakenly multiplied by 10 instead of 1,000. Choice D is even further from the correct answer, as it suggests only 4 milliliters, which is significantly less than the actual conversion of 4 liters to milliliters.
4. A team from the highway department can replace 14 streetlights in 7 hours of work. If they work a 30-hour week at this job, in how many weeks will they replace all 120 downtown streetlights?
- A. 1½ weeks
- B. 2 weeks
- C. 2½ weeks
- D. 3 weeks
Correct answer: B
Rationale: If the team can replace 14 streetlights in 7 hours, it means they replace 2 streetlights per hour. In a 30-hour week, they can therefore replace 2 x 30 = 60 streetlights. To replace all 120 downtown streetlights, they will need 120 / 2 = 60 hours, which is equivalent to 60 / 30 = 2 weeks. Therefore, the correct answer is 2 weeks. Choice A, 1½ weeks, is incorrect because it doesn't consider the total number of streetlights that need to be replaced. Choice C, 2½ weeks, is incorrect as it overestimates the time needed. Choice D, 3 weeks, is incorrect as it underestimates the efficiency of the team in replacing streetlights.
5. Solve for x: 5x + 10 = 20.
- A. 4
- B. 2
- C. 5
- D. 7
Correct answer: A
Rationale: To solve the equation 5x + 10 = 20, first subtract 10 from both sides to isolate the term with x: 5x = 10. Then, divide by 5 on both sides to find the value of x: x = 2. Therefore, the correct answer is A. Choice B is incorrect because x is not equal to 2 but 4. Choice C is incorrect as x is not equal to 5. Choice D is incorrect as x is not equal to 7.
Similar Questions
Access More Features
HESI A2 Basic
$99/ 30 days
- 3,000 Questions with answers
- 30 days access
HESI A2 Premium
$149.99/ 90 days
- Actual HESI A2 Questions
- 3,000 questions with answers
- 90 days access