multiply 52 04
Logo

Nursing Elites

HESI A2

HESI A2 Math 2024

1. Multiply: 52 × 04 =

Correct answer: B

Rationale: To multiply 52 by 04, you first multiply the two numbers together: 52 x 4 = 208. Since there are two decimal places in the expression, you need to divide the result by 100, which gives you 0.0208. Therefore, the correct answer is B. Choice A (0.00208) is incorrect because it represents a much smaller value obtained by considering the decimal incorrectly. Choice C (0.208) is incorrect because it does not account for the decimal placement. Choice D (2.08) is incorrect as it does not consider the requirement to convert the result into decimal form.

2. If the outside temperature is 59 degrees on the Fahrenheit scale, what is the approximate temperature on the Celsius scale?

Correct answer: B

Rationale: To convert Fahrenheit to Celsius, you can use the formula: °C = (°F - 32) x 5/9. Substituting the Fahrenheit temperature of 59 degrees into the formula: °C = (59 - 32) x 5/9 = 27 x 5/9 = 135/9 = 15. Therefore, the approximate temperature on the Celsius scale is 15°C. Choice A is incorrect as it represents a negative temperature which is not the case here. Choice C and D are also incorrect as they do not match the calculated conversion from Fahrenheit to Celsius.

3. How many feet are in 2 miles?

Correct answer: C

Rationale: To convert miles to feet, multiply the number of miles by the conversion factor of feet per mile. Since there are 5280 feet in 1 mile, to find the number of feet in 2 miles, you multiply 2 by 5280, resulting in 10560 feet. Choice A, 5280 feet, is the conversion factor for 1 mile, not for 2 miles. Choices B and D are incorrect calculations that do not follow the conversion factor correctly.

4. The individual is completing their time sheet. They worked 8 ½ hours on Monday, 8 hours on Tuesday, 6 ¾ hours on Wednesday, and 9 hours each on the last two days of the week. If their hourly pay rate is $15.65, how much would their gross pay be for that week?

Correct answer: A

Rationale: To calculate the total hours worked, add 8.5 + 8 + 6.75 + 9 + 9, which equals 41.25 hours. To determine the gross pay, multiply the total hours worked (41.25) by the hourly rate ($15.65): 41.25 * $15.65 = $645.56. This precise calculation ensures accurate compensation for the hours worked, emphasizing the importance of financial accuracy in payroll management. Choice B, C, and D are incorrect as they do not result from the accurate calculation of total hours worked multiplied by the hourly rate, providing a good illustration of the consequences of miscalculations in payroll processing.

5. What is 110% of 40?

Correct answer: D

Rationale: To find 110% of a number, you multiply the number by 1.10. Therefore, 1.10 * 40 = 44. Since 110% of 40 is 44, the correct answer is D. Choice A (60) is the result of finding 150% of 40, not 110%. Choice B (50) is incorrect as it represents 125% of 40. Choice C (55) is not the correct answer as it corresponds to 137.5% of 40.

Similar Questions

What is 72 inches converted to feet?
If the ratio and proportion 15:2000=x:200, what is the value of x?
Divide and simplify: 4⅛ ÷ 1½ =
What is the volume of water needed to fill a rectangular swimming pool with dimensions 10 meters by 5 meters and a depth of 2 meters?
Train A leaves the station at 1:45 traveling at a constant speed of 65 mph. If it arrives at its destination at 3:15, how many miles did it travel?

Access More Features

HESI A2 Basic
$89/ 30 days

  • 3,000 Questions with answers
  • 30 days access

HESI A2 Premium
$129.99/ 90 days

  • Actual HESI A2 Questions
  • 3,000 questions with answers
  • 90 days access

Other Courses