HESI A2
HESI A2 Quizlet Math
1. When a die is rolled, what is the probability of rolling an odd number?
- A. 16.67%
- B. 33.33%
- C. 75%
- D. 50%
Correct answer: D
Rationale: When a die is rolled, there are 3 odd numbers (1, 3, 5) out of a total of 6 possible outcomes. The probability of rolling an odd number is calculated by dividing the number of favorable outcomes (3) by the total number of outcomes (6), resulting in a probability of 3/6 or 50%. Therefore, the correct answer is D. Choices A, B, and C are incorrect because they do not reflect the correct probability calculation for rolling an odd number on a standard six-sided die.
2. What is the result of adding 6 3/4 + 8 1/6?
- A. 14 11/12
- B. 12 3/4
- C. 12 3/24
- D. 14 2/5
Correct answer: A
Rationale: To add mixed numbers, convert them to improper fractions: 6 3/4 = 27/4 and 8 1/6 = 49/6. Then, add the fractions to get 27/4 + 49/6 = 162/24 + 98/24 = 260/24 = 21 20/24 = 21 10/12 = 21 5/6 = 14 11/12. Therefore, the correct answer is 14 11/12. Choice B (12 3/4) is incorrect as it does not match the correct calculation. Choice C (12 3/24) is incorrect due to the erroneous denominator in the final fraction. Choice D (14 2/5) is incorrect as it does not correspond to the correct sum of the fractions.
3. What is the result of adding 5 2/9 and 1 2/9?
- A. 6 4/9
- B. 7 5/9
- C. 7
- D. 5 2/9
Correct answer: A
Rationale: To add mixed numbers with fractions, first add the whole numbers together: 5 + 1 = 6. Then add the fractions: 2/9 + 2/9 = 4/9. Combining the whole number and the fraction parts gives 6 4/9. Therefore, the correct answer is 6 4/9. Choice B (7 5/9) is incorrect as the fractions were not added correctly. Choice C (7) is incorrect as it does not account for the fractions. Choice D (5 2/9) is one of the original numbers and not the sum of both.
4. If two workers can finish building a play set in 18 hours, how long will it take 4 workers to build 3 play sets?
- A. 27 hours
- B. 36 hours
- C. 24 hours
- D. 54 hours
Correct answer: A
Rationale: If 2 workers can complete building one play set in 18 hours, it means one worker would take 36 hours to complete the same task. When the number of workers is doubled to 4, the time is halved, so 4 workers would take 18 hours to build one play set. To build 3 play sets, the total time needed would be 3 times the time for one play set, which equals 54 hours. Therefore, 4 workers can build 3 play sets in 27 hours, making choice A the correct answer. Choices B, C, and D are incorrect because they do not account for the correct relationship between the number of workers and the time required to complete the task.
5. How many inches are in 1.5 yards?
- A. 54 inches
- B. 60 inches
- C. 72 inches
- D. 84 inches
Correct answer: A
Rationale: To convert yards to inches, multiply the number of yards by 36 (since there are 36 inches in a yard). 1.5 yards × 36 inches/yard = 54 inches. Therefore, the correct answer is 54 inches. Choice B, 60 inches, is incorrect as it incorrectly assumes that there are 40 inches in a yard. Choice C, 72 inches, is incorrect as it multiplies 1.5 by 48, which is not the correct conversion factor. Choice D, 84 inches, is incorrect as it multiplies 1.5 by 56, which is not the correct conversion factor.
Similar Questions
Access More Features
HESI A2 Basic
$49/ 30 days
- 3,000 Questions with answers
- 30 days access
HESI A2 Premium
$99/ 90 days
- Actual HESI A2 Questions
- 3,000 questions with answers
- 90 days access